For too long, energized electrical testing has had a Wild West problem.
The electrical industry has made major progress in safety. Standards have improved. Training has improved. Labels, procedures, PPE, and arc-flash awareness have all improved.
But the actual testing method used by technicians in the field has changed very little.
Qualified electricians are still often required to stand in front of energized electrical equipment, hold test probes by hand, move leads from point to point, switch between meters, and complete required testing while exposed to the very hazard everyone is trying to control.
That is the problem Arc Safe Electrical Testing System was created to address.
Arc Safe is not a consumer gadget. It is not an “as seen on TV” product. It is a specialized industrial safety system designed for the real world of electrical contracting, startup, commissioning, maintenance, troubleshooting, and energized three-phase testing.
Modern electrical safety standards recognize that the best way to protect workers is to reduce or eliminate exposure to hazards whenever possible.
PPE is important. Training is important. Procedures are important.
But PPE does not remove the worker from the hazard. It only gives the worker a better chance of surviving if something goes wrong.
Arc Safe was designed around a different question:
Why are we still asking technicians to perform critical three-phase energized testing with tools that were never designed around the full testing workflow?
Traditional two-lead digital multimeters remain the standard tool for many electrical tests. But during three-phase startup and commissioning work, technicians may also need to verify phase sequence, phase rotation, voltage relationships, and other required conditions.
That often means changing leads, changing instruments, repositioning probes, and staying exposed longer than necessary.
Arc Safe was created to make that process safer, faster, and more consistent.
The market for Arc Safe includes electrical contractors, panel builders, commissioning teams, maintenance departments, manufacturing facilities, warehouses, data centers, hospitals, government facilities, military installations, and other organizations that routinely test energized electrical systems.
Every facility with substantial electrical infrastructure eventually requires startup testing, maintenance, troubleshooting, modernization, shutdown work, or retesting.
As electrical infrastructure expands, the need for safer and more efficient testing methods will continue to grow.
The question is not whether energized electrical testing will continue.
It will.
The question is whether the industry will continue doing it the old way.
The patented Arc Safe Electrical Testing System is a five-pole electrical testing platform designed specifically for energized three-phase testing.
Its purpose is simple:
Reduce the number of steps.
Reduce unnecessary lead changes.
Reduce instrument swapping.
Reduce exposure time.
Improve testing consistency.
Instead of forcing the technician to work through a series of separate testing steps with traditional tools, Arc Safe is designed around the actual workflow of three-phase electrical testing.
That is the difference.
Arc Safe does not merely add another meter to the toolbox. It rethinks the testing process itself.
There was a time when seat belts and airbags were treated as optional safety features.
Today, no one seriously argues that vehicles should be built without them.
Arc Safe has the potential to represent that kind of shift in energized electrical testing.
Once UL certified and listed, Arc Safe could become a new safety benchmark for contractors, facility owners, manufacturers, insurers, and safety professionals who understand the cost of electrical incidents.
The goal is not just to sell a meter.
The goal is to help move the industry toward a safer standard of energized testing.
Based on the size of the electrical contracting, commissioning, maintenance, industrial, government, military, and facility-management markets, our preliminary sales model projects the following:
Arc Safe 5-pole, 12-function meter:
Year 1: 7,500 units
Year 2: 15,000 units
Year 3: 30,000 units
Arc Safe permanent wiring harness / plug assembly:
Year 1: 50,000 units
Year 2: 100,000 units
Year 3: 325,000 units
These projections are based on a specialized industrial safety market, not a consumer retail market. Arc Safe is designed for professionals and organizations that work around energized electrical systems and have a direct safety, legal, operational, and financial interest in reducing exposure.
Arc Safe Electrical Testing System is protected by utility patent rights and was developed to address a long-standing safety gap in energized three-phase testing.
We are seeking qualified investors, manufacturing partners, licensing partners, and strategic safety partners who understand the potential of a patented safety product designed for a large, regulated, and safety-conscious industry.
The full financial model, technical overview, and investment materials are available upon request.
Arc Safe Electrical Testing System: designed to make energized electrical testing safer, faster, and more consistent.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.